Home 
CHENGDU KINGFA SCI. & TECH. ADVANCED MATERIALS CO., LTD.
2017
The annual capacity of phase I project was up to 0.2 million tons in December 2017
The annual capacity of phase I project was up to 0.2 million tons in December 2017
2017-12-16
Copyright © 2025 Kingfa Sci.&Tech. Co.,Ltd. All Rights Reserved Privacy Policy Tel:(+86) 020 6681 8888